Dublin Port Company logo. Growing, Sustaining and Developing Dublin Bay

No. 6 of 2012

Dublin Port Company

NOTICES TO MARINERS

No. 6 OF 2012

EastLink Bridge

The opening times of the  “Eastlink Bridge” will be restricted to the following:

Monday  to  Friday

No Opening Between:  06:30 hrs to 10:00 hrs  &  15:00 hrs to 20:00 hrs

Commercial Traffic

Bridge will be opened for Commercial traffic as and when required but subject to :-

a)      the specified “no opening” times

b)      a minimum of 2 hours notice.

c)      road traffic at that time.

If tugs are being used then the latest opening time will be ½ hour earlier than the stated no opening time.

Leisure Craft:

Bridge will be opened for leisure craft between

00:00 hrs  to 06:30 hrs         At 11:00 hrs     20:00 hrs  to  24:00 hrs

Saturday and Sunday

Bridge will be opened for Commercial and Leisure craft subject to a minimum of 2 hours notice and road traffic.

These restrictions may be varied on a case-by-case basis, depending upon circumstance, and only with the permission of the Harbour Master.

The Port Traffic signals used for the lifting span are as follows:

3 Vertical Red Lights to mean vessels shall not proceed.

3 Vertical Green Lights to mean vessels may proceed. (One way traffic only).

3 vertical Red Lights FLASHING to mean Emergency – all vessels stop or divert.

Communication with the operator can be made on VHF radio Channels 12 and 13 call sign “East Link”.

Width of Opening Span = 31.5 metres

Clearance under bridge = 6.35 metres above Chart Datum   (2.25 metres at M.H.W.S.)

Captain David  T. Dignam
Harbour Master

1st January 2012

 

White wave background in the header (it is replaced by image in CSS code)